Electrical
Grounding and Bonding Drawings: What NEC 250 Requires
NEC Article 250 grounding and bonding, explained for drawings: electrodes, conductor sizing, bonding jumpers, and what the reviewer checks on the sheet.
TL;DR
Grounding and bonding are two different jobs that share one drawing. Grounding connects the electrical system to the earth through the grounding electrode system. Bonding connects metal parts together so a fault has a low-impedance path back to the source and the overcurrent device trips. On the drawings, the reviewer checks three things: every electrode present is shown and bonded into one system, the grounding electrode conductor is sized from Table 250.66, and the main bonding jumper and piping bonds are shown with sizes and connection points. Miss any one of them and the single-line diagram reads as incomplete.
Grounding is not bonding, and the drawings must show both
A plan reviewer sees the confusion on drawings every week. A ground rod is drawn, a wire runs to the panel, and the designer assumes the job is done. NEC Article 250 treats grounding and bonding as separate requirements, and each one needs its own callouts on the sheet.
Grounding connects the system to the earth. It limits voltage from lightning, line surges, and contact with higher-voltage lines, and it stabilizes voltage to earth during normal operation. Bonding connects metal parts that are not supposed to carry current, such as enclosures, raceways, and piping, so that a ground fault has a low-impedance path back to the source. Without bonding, a fault can energize a metal enclosure and nobody knows until someone touches it. Without grounding, the system has no reference to earth at all.
On a small commercial project, both jobs land on the same single-line diagram and the same grounding detail. The reviewer reads them together, so the drawings must show them together, with sizes, not with a generic note that says "ground per NEC."
The grounding electrode system: every electrode present, bonded into one system
Section 250.50 is the rule that catches the most drawings. All grounding electrodes described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrode system. Where none of those electrodes exist, one or more electrodes from 250.52(A)(4) through (A)(8) must be installed.
The electrodes the drawings must account for are:
- Metal underground water pipe, 10 feet or more in direct contact with the earth. It must be supplemented by an additional electrode.
- Metal frame of the building, where effectively grounded.
- Concrete-encased electrode, known as a Ufer ground: 20 feet or more of 1/2 inch or larger rebar, or 20 feet of 4 AWG or larger bare copper, encased in at least 2 inches of concrete at the bottom of a foundation in direct contact with the earth.
- Ground ring: 2 AWG or larger bare copper, at least 20 feet long, encircling the building and buried at least 30 inches deep.
- Rod and pipe electrodes: a rod at least 8 feet long.
- Plate electrodes: at least 2 square feet of contact surface with the earth.
The mistake is almost always the same. A foundation has a Ufer electrode in it, the structural drawings show it, and the electrical drawings never mention it. Or a metal water service enters the building and the drawings show it as the only electrode, with no supplement. The reviewer cannot approve a grounding electrode system that the drawings do not show. List every electrode that exists on the project, show the bond between them, and note the connection point on the grounding detail.
Sizing the grounding electrode conductor: Table 250.66
The grounding electrode conductor, the GEC, connects the service to the grounding electrode system. It is sized from Table 250.66, using the largest ungrounded service-entrance conductor. Not the breaker size. That distinction is the single most common sizing error on small commercial drawings.
| Largest ungrounded service conductor (copper) | GEC (copper) | GEC (aluminum) |
|---|---|---|
| 2 AWG or smaller | 8 AWG | 6 AWG |
| 1 or 1/0 AWG | 6 AWG | 4 AWG |
| 2/0 or 3/0 AWG | 4 AWG | 2 AWG |
| Over 3/0 to 350 kcmil | 2 AWG | 1/0 AWG |
| Over 350 to 600 kcmil | 1/0 AWG | 3/0 AWG |
| Over 600 to 1,100 kcmil | 2/0 AWG | 4/0 AWG |
| Over 1,100 kcmil | 3/0 AWG | 250 kcmil |
Worked example: a 200-amp service with 2/0 copper service conductors takes a 4 AWG copper GEC (2 AWG aluminum). The 200-amp breaker did not decide that size. The 2/0 service conductors did. For parallel sets, size by the equivalent conductor area, not by one set alone.
Three caps in 250.66 limit how large the GEC ever needs to be. Where the GEC connects only to a rod, pipe, or plate electrode, it need not be larger than 6 AWG copper or 4 AWG aluminum. Where it connects only to a concrete-encased electrode, it need not be larger than 4 AWG copper. Where it connects only to a ground ring, it need not be larger than the ring conductor itself. The cap applies only to the section that is the sole tie to that electrode. If the GEC continues on to another electrode type, size the rest of the run from the table.
GEC versus EGC: the confusion that fails reviews
The grounding electrode conductor and the equipment grounding conductor are not the same conductor, and they are not sized the same way. The GEC connects the service to earth and is sized from Table 250.66 on the service conductor size. The equipment grounding conductor, the EGC, runs with the circuit conductors and is sized from Table 250.122 on the overcurrent device rating. A 200-amp service typically has a 4 AWG copper GEC and a 6 AWG copper EGC. Swapping them, or showing one conductor doing both jobs, is a correction waiting to happen. Label each one on the single-line diagram so the reviewer never has to guess which is which.
The main bonding jumper and the system bonding jumper
The main bonding jumper connects the grounded (neutral) conductor to the equipment grounding conductor and the service disconnect enclosure at the service. It can be a wire, a bus, or a screw, and a screw must have a green finish visible when installed. It is sized per Table 250.102(C)(1) from the largest ungrounded service conductor.
It goes at the service disconnect. That placement matters, because a bonding jumper shown at a subpanel instead of the service is one of the most frequent corrections on small commercial sets. A subpanel gets a separate equipment grounding conductor and an isolated neutral, not a second main bonding jumper.
Separately derived systems get their own treatment under 250.30. Transformers and generators get their own system bonding jumper and grounding electrode conductor, sized from Table 250.66 on the largest derived ungrounded conductor, and connected to the building grounding electrode system. Show the separately derived system grounding path explicitly on the single-line diagram. A transformer drawn with no grounding path is an incomplete riser, and the reviewer will send it back.
Bonding piping and steel: what to show on the plans
Interior metal water piping is bonded to the service equipment under 250.104(A)(1), sized from Table 250.102(C)(1), and never larger than 3/0 copper or 250 kcmil aluminum. Other metal piping likely to become energized, such as gas, sprinkler, and air piping, is bonded per 250.104(B) using Table 250.122, based on the circuit likely to energize it. The circuit equipment grounding conductor can serve as the bond. Gas piping bonding is also required by IFGC 310.1, so the drawings should show it rather than leaving it to the field.
Exposed structural steel that is effectively grounded gets bonded into the same system. On the plans, show the bond connection point, the conductor size, and the routing. A note that says "bond all piping" with no size and no location is not a detail. The reviewer needs to see where the bond lands and what size it is.
What changes on the drawings
Grounding and bonding are not a note on the cover sheet. They change four things on a small commercial set:
- The single-line diagram gets the grounding electrode system, the GEC with its Table 250.66 size, the main bonding jumper with its Table 250.102(C)(1) size, and the separately derived system path where a transformer or generator exists. Each conductor is labeled with its size and its table reference.
- The grounding detail shows the electrode schedule: each electrode type present, its size and length, the bond between electrodes, and the connection points. The Ufer, the water pipe, the rods, and the ring all appear here, not just in the structural set.
- The panel schedule notes agree with the single-line diagram. If the riser shows a 4 AWG copper GEC, the panel notes do not say 6 AWG. The reviewer cross-checks these two sheets first.
- The inspection notes state that connections must be accessible and made by listed means, that the GEC must be securely fastened and protected where exposed to physical damage, that copper within 18 inches of the earth needs corrosion protection, and that the 25-ohm test note applies where a single rod is used.
One more point that belongs on the drawings rather than in a meeting: grounding does not decide whether a building needs a service upgrade or a new electrode. The service size comes from the Article 220 load calculation. Article 250 then tells you how to ground and bond that service. If the service size changes, recheck the GEC size against Table 250.66, because the table keys off the service conductors.
Common mistakes that fail plan review
- Sizing the GEC from the breaker instead of the service conductors.
- Confusing the GEC with the EGC, or showing one conductor doing both jobs.
- Showing the metal water pipe as the only electrode, with no supplement.
- Having a Ufer electrode in the foundation that never appears on the electrical drawings and is never bonded.
- Missing the main bonding jumper, or showing it at a subpanel instead of the service.
- Drawing a transformer or generator with no separately derived system grounding path.
- Missing the bonding jumper for gas piping.
- Showing no electrode schedule, so the reviewer cannot tell which electrodes exist or how they connect.
FAQ
Is a ground rod alone enough?
Only with a 25-ohm test or a second electrode. Under 250.53(A)(2), a single rod, pipe, or plate electrode must have a resistance to ground of 25 ohms or less. If it exceeds 25 ohms, a second electrode is required. With two rods, no further testing is required regardless of resistance. Rod, pipe, and plate electrodes must be spaced at least 6 feet apart.
Does the GEC need to be as large as the service conductors?
No. Table 250.66 sizes it well below the service conductors. A 200-amp service with 2/0 copper service conductors takes a 4 AWG copper GEC.
Where does the main bonding jumper go?
At the service disconnect, not at subpanels. It connects the grounded conductor to the equipment grounding conductor and the service enclosure at that one point.
Do plastic water service lines change anything?
Yes, for the electrode list. With no metal water pipe in contact with the earth, there is no water pipe electrode, so another electrode carries the system. The drawings must show which one.
What edition should I design to?
The edition the authority having jurisdiction adopted. Most US jurisdictions have adopted the 2020 or 2023 edition of NFPA 70. Confirm the adopted edition with the AHJ before the drawings go in, and note the edition on the cover sheet.
Sources
- NFPA 70, National Electrical Code, Article 250 (Grounding and Bonding)
- NFPA, Grounding and Bonding fact sheet (nfpa.org)
- Mike Holt, grounding and bonding newsletter (mikeholt.com)
- Ampora Labs, NEC Article 250 grounding guide (amporalabs.com)
- Engineers Universe, electrical panel grounding NEC 250 (engineersuniverse.com)
- JCR Productions, bonding jumper sizing, 250.102 and 250.104 (jcrproductions.com)
Related reading and services
- Single-line diagram mistakes that fail review
- Commercial electrical service upgrade
- Panel schedule mistakes that trigger plan review corrections
- Electrical load calculation NEC 220 walkthrough
- Electrical load calculator
- Single-line diagram
- Power upgrade
Need grounding and bonding shown correctly on your next set? Drafting Studio drafts permit-ready 2D single-line diagrams, panel schedules, and grounding details for small commercial projects, with the electrode schedule and Table 250.66 sizing on the sheet so the reviewer sees it the first time.
Grounding electrode conductor sizing on the drawings
Grounding electrode conductor sizing is checked against Table 250.66 on the single-line diagram, so the GEC size, material, and electrode connection are shown together and match the service conductors listed on the sheet.
Need similar drawings?
Get permit-ready electrical drawings for your project
Send us your plans and scope — we'll come back with a fixed price and a turnaround date. No obligation.
Keep reading
Related articles
ElectricalElectrical Room Layouts That Pass Plan Review
Electrical rooms collect more plan-review comments than almost any other space. Here is how we lay out clearances, dedicated space, and egress to NEC…
ElectricalEV Charging Permit Drawings: What AHJs Want to See
EVSE additions are one of the fastest-growing permit categories. This is the drawing package AHJs expect: 125-percent load calcs, panel schedules that…
Electrical7 Panel Schedule Mistakes That Trigger Plan-Review Corrections
Seven panel-schedule errors that reliably trigger correction letters — mismatched breakers, missing AIC ratings, load totals that do not tie — and how…
Get a fixed drafting quote in under 24 hours
Send us your architectural plans and scope. We'll come back with a fixed price and a turnaround date — no obligation.
