A load calculation answers one question: how big does the service need to be? Get it wrong high and you overpay for gear; get it wrong low and you fail review. Here is the standard-method flow we use on every calc.

Standard method or optional method?

Article 220 gives you two roads, and the first decision is which one you are allowed to take. Part III is the standard method (220.40 through 220.61): it works for every occupancy, and every AHJ accepts it. Part IV is the optional method, but it is only available to specific building types — dwelling units (220.82), existing dwelling units (220.83), multifamily dwellings (220.84), and schools (220.86). The optional method usually produces a smaller service size, which is exactly why clients ask for it — and exactly why reviewers check eligibility first. If your project qualifies, run both methods and submit the optional calculation with the eligibility noted. If it does not qualify, do not force it; a misapplied optional method is an automatic correction. Everything below follows the standard method, because that is what commercial, retail, restaurant, and mixed-use work almost always requires.

1. Inventory the connected load

List every load by category: general lighting and receptacles (by area), fixed appliances, HVAC, motors, kitchen equipment, EV charging, and any special loads. Capture nameplate data — volts, amps, kVA — for each.

Gather the data from the sources that actually exist: the mechanical engineer's equipment schedule for HVAC, the plumbing schedule for water heaters and pumps, the kitchen equipment cut sheets for food service, and a site walk or the owner's equipment list for everything else. For each item record the voltage, the full-load amps or kVA, whether the load is continuous (expected to run three hours or more — Articles 210 and 215 treat these at 125%) or noncontinuous, and the motor horsepower where it applies. Flag EV charging early: NEC 625.41 treats electric vehicle supply equipment as a continuous load, so it lands in the total at 125%. The most common inventory failure is not a wrong number — it is a missing load discovered after the gear is ordered. Walk the panel schedules against the equipment schedules line by line before you total anything.

2. Apply the right demand factors

Not everything runs at once. NEC Article 220 lets you apply demand factors by category:

Load categoryTypical basis
General lightingVA per sq ft, then 220.42 demand
Receptacles (non-dwelling)First 10 kVA at 100%, remainder at 50%
Kitchen equipment220.56 demand by count
Largest motor+25% per 430.24

A few notes on applying this table correctly. General lighting starts from Table 220.12, which lists the unit load in VA per square foot by occupancy — offices, retail, schools, and warehouses each have their own value, and the 2023 NEC revised these numbers downward to reflect LED reality, so confirm you are reading the table from the edition your AHJ adopted. Once you have the lighting VA, 220.42 sets the demand: dwelling calculations step down after the first 3,000 VA, hospitals and hotels have their own tiers, warehouses break at 12,500 VA, and most other commercial occupancies take the lighting load at 100%. Receptacles in non-dwelling occupancies start from 220.14(I) — 180 VA per receptacle outlet — and 220.44 applies the demand: the first 10 kVA at 100%, the remainder at 50%. In dwellings the receptacle load is already folded into the 3 VA per square foot, so do not double-count it. Kitchen equipment uses Table 220.56 by unit count: one or two pieces at 100%, three at 90%, four at 80%, five at 75%, and six or more at 65% — count only actual commercial cooking equipment, not every plug in the break room. The largest motor gets 125% of its full-load current per 430.24; name it on the schedule so the reviewer sees which motor you picked.

An electrician measuring conductor current inside a panelboard, the field data behind NEC Article 220 load calculations.
An electrician measuring conductor current inside a panelboard, the field data behind NEC Article 220 load calculations.

3. Add the continuous-load and motor adjustments

Continuous loads are taken at 125%. The largest motor gets an additional 25%. These two adjustments catch more first-time reviewers than anything else.

4. Total and size the service

Sum the demand load, convert to amps at the service voltage, and select the next standard service size. Document every assumption — a reviewer wants to trace your number back to the code.

The conversion is straightforward: single-phase amps = VA ÷ volts, three-phase amps = VA ÷ (volts × 1.732). Select the next standard rating per 240.6 — 100, 225, 400, 600, 800, 1200, 1600, 2000, 2500, 3000 amps — so a 348-amp demand becomes a 400-amp service, not a 350-amp one. Service conductors follow 230.42: 125% of the continuous load plus 100% of the noncontinuous load. One judgment call to handle explicitly is spare capacity. Reviewers do not require it, but owners usually want 20–25% for future growth — show it as spare breaker spaces and a noted spare kVA on the panel schedule, not as an oversized service the utility then has to justify.

Keep the panel schedule and the load summary in the same file. When the two disagree, the reviewer notices — and so does the inspector.

5. Produce the load letter

Utilities and many AHJs want a load letter: connected load, demand load, and service size on one page, ready for your PE to stamp. That single sheet keeps the service application moving.

Most utilities have their own load-sheet form asking for connected kW, demand kW, the largest motor (they size their transformer around motor starting), the requested service voltage and phase, and the date power is needed. Fill it from the same calculation — never from a second spreadsheet — and make sure the PE stamp covers the same numbers that appear on the drawings. When the utility planner, the AHJ reviewer, and the field inspector all read the same numbers, the project moves; when they differ, everything stops for reconciliation.

Walking through the numbers: a 3,000 sq ft office

A short example ties the method together. Take a small single-tenant office on a 208Y/120 V three-phase service:

LoadConnectedBasisDemand VA
General lighting3,000 sq ft × 1.3 VA/sq ftTable 220.12; 220.42 at 100%3,900
Receptacles50 outlets × 180 VA220.14(I); 220.449,000
Rooftop unit (nameplate)10.1 kVANameplate10,100
Largest motor adder3.5 kVA motor × 25%430.24875
Signage (continuous)1,200 VA × 125%Continuous-load rule1,500
Total demand25,375 VA

Amps = 25,375 ÷ (208 × 1.732) ≈ 70 amps. The next standard service size per 240.6 is 100 amps. Real buildings carry more line items — water heaters, IT loads, EV charging — but the shape of the work is identical: inventory, demand-factor, adjust, total, size. If your total lands at 96 amps on a 100-amp service, that is a design conversation with the owner, not a rounding exercise.

The five corrections reviewers write most

  1. Continuous loads not taken at 125%. EV charging (625.41), commercial lighting, and anything expected to run three hours or more — miss the multiplier and the whole total comes in low.
  2. The largest-motor 25% is missing. Reviewers look for which motor you applied 430.24 to; if none is identified, they assume you forgot.
  3. The panel schedule total does not match the load summary. Two documents, two numbers — the fastest correction in the business.
  4. Receptacle loads with no 220.14(I) basis. Fifty receptacles at an invented VA each, or the 220.44 demand skipped entirely.
  5. No traceable assumptions. Square footages, unit counts, and nameplate sources unstated, so the reviewer cannot verify a single line.

What the drawing set shows

The calculation does not live alone. The load summary belongs on the electrical cover sheet or the first power sheet, the panel schedules carry the same totals, and the single-line diagram reflects the selected service size with the service disconnect, grounding, and utility metering shown. Add a general note stating the basis — "Service sized per NEC Article 220 standard method; continuous loads at 125%; largest motor at 125% per 430.24" — so the reviewer reads your code path before opening the math. When the note, the summary, and the schedules agree, the electrical review is usually the shortest one in the set.

A quick checklist

  • Inventory every connected load
  • Apply Article 220 demand factors
  • Take continuous loads at 125%
  • Add 25% for the largest motor
  • Select the next standard service size
  • Document assumptions and produce the load letter

Done in this order, a standard-method calc is fast, defensible, and easy to review.

Need the calculation behind your next service? Our electrical load calculation service produces the NEC Article 220 basis — connected and demand loads, panel schedules, and the utility load letter — and the single-line diagram turns it into the reviewer's roadmap. Request a quote with your equipment list and we will size the service.

Need similar drawings?

Get permit-ready electrical drawings for your project

Send us your plans and scope — we'll come back with a fixed price and a turnaround date. No obligation.

Get a fixed drafting quote in under 24 hours

Send us your architectural plans and scope. We'll come back with a fixed price and a turnaround date — no obligation.