Drafting Studio

Electrical Design

Power Upgrade

Upgrading an existing electrical service? We draft the permit set — existing versus new service, panel replacement, feeder routing and the load basis that justifies the new size.

5-day turnaroundElectrical

How it works

From upload to permit-ready set

5 business days — start to delivery

  1. 01

    Upload & confirm

    Send your plans and scope; we confirm a fixed price and date.

  2. 02

    Document review

    We review inputs and flag anything missing up front.

  3. 03

    2D drafting

    Your set is drafted in AutoCAD to code and your CAD standard.

  4. 04

    Quality check

    Internal QC against the code and your requirements.

  5. 05

    Delivery

    Layered DWG + plotted PDF, with two free minor revisions.

Fast Turnaround

Most sets delivered in 3–7 business days, rush options available.

Code-Compliant

Drawn to current US codes and formatted for AHJ / permit submission.

Pure 2D AutoCAD

Clean, layered DWG + PDF sets — fast, precise, and easy to work with.

Two Free Revisions

Included minor revisions so the set lands right the first time.

What's included

Every power upgrade package is delivered as a layered 2D AutoCAD set.

  • Existing vs. new service one-line diagram
  • Demolition & new work power plans
  • Service entrance, metering & main disconnect layout
  • Feeder routing with conduit & conductor callouts
  • Updated panel schedules
  • Load tabulation supporting the new service size
  • Grounding & bonding upgrade details
  • General notes & legend
  • Layered DWG + plotted PDF
.dwg.pdf.dxf (on request).xlsx / .pdf reports
Documents required
  • Existing one-line and/or panel schedules
  • Photos or survey of the existing service equipment
  • Floor plan (DWG or PDF)
  • New equipment list and loads being added
  • Utility correspondence, if the service size is already agreed
What's not covered
  • PE stamping / engineer of record sign-off
  • On-site surveys or field verification visits
  • Permit filing or agency expediting
  • Structural, civil, or architectural design
Delivery standards

Drafted to current US codes and your CAD standard, QC-checked, with two free minor revisions. Ready for your engineer to review and stamp.

Existing conditions, then the upgrade

A service upgrade lives or dies on how clearly you show the reviewer what is there today and what changes. We draft both: an existing-conditions one-line marking what is demolished or reused, and the new service with its metering, main disconnect, distribution equipment and feeders.

Sized on a defensible load basis

We build the connected and demand load tabulation that supports the new service size — existing loads retained, loads removed, and the new equipment being added — so the ampacity you are asking for is backed by numbers on the sheet. Panel schedules are reissued to reflect the new distribution.

Drawn for the AHJ and the installer

Demolition and new work are separated on their own sheets or clearly hatched, conduit and conductor callouts follow the feeder runs, and grounding and bonding upgrades are shown to current code.

FAQ

Power Upgrade questions

Have a question or scope?

Ask about power upgrade or start a fixed quote. We reply within one business day.