Restaurant
Full NEC load calculation and electrical set for a kitchen-heavy restaurant fit-out.
Kitchen equipment schedule and connections, NEC 220 demand load calc, service one-line, panel schedules, dining and back-of-house lighting circuits.
Delivered as a coordinated 2D AutoCAD set (layered DWG + plotted PDF), drafted to current US codes and formatted for permit submission.
Send us your architectural plans and scope. We'll come back with a fixed price and a turnaround date — no obligation.