TI permits for quick-service and retail rollouts stall on incomplete packages, not bad design. This is the full permit-package checklist we run on…

By Drafting Studio Sep 10, 2026 4 min read
Tenant Improvement Drawing Checklists for Fast Rollout Sites

Why TI Packages Stall in Plan Check

Tenant improvement permits for quick-service restaurants and retail rollouts should be the simplest submittals in commercial construction. The shell exists. The use is established. And yet TI packages stall constantly — not because the design is wrong, but because the package is incomplete. A missing energy form, a load calculation that does not match the panel schedule, a plumbing fixture count with no code citation: any one of these buys you a correction cycle, and correction cycles are where rollout schedules go to die.

The fix is not heroic drafting. It is a checklist, applied the same way on every site, by everyone on the team.

Mechanical Scope: What the Examiner Looks For

For a typical QSR or retail TI, the mechanical sheets need to tell the full story: demolition and new HVAC plans, equipment schedules with capacities and electrical characteristics, outside air calculations per the adopted mechanical code, and controls sequences clear enough that the examiner can verify compliance without guessing. If the space ties into a landlord or base-building system, show the tie-in points and note who owns what.

The single most common mechanical correction we see is an outside air calculation referencing the wrong code section — usually because the prototype was developed under a different code cycle than the site's jurisdiction. Check the adopted cycle first, on every site, before a single calculation is run.

Electrical Scope: Make the Numbers Agree Everywhere

Electrical TI packages live or die on consistency. The load calculation, the panel schedules, the single-line diagram, and the equipment schedules must all tell the same story with the same numbers. Examiners cross-check: if the NEC Article 220 load calculation says 168 amps and the panel schedule totals 142, you are getting a correction letter.

Include lighting plans with fixture schedules, lighting power density calculations for energy compliance, receptacle and equipment plans coordinated against the kitchen equipment list, and fire alarm device layouts where the scope triggers them. For restaurants, confirm service size with the utility early — a service upgrade discovered during plan check can add months, not weeks.

Plumbing Scope: Fixtures, Gas, and Grease

Plumbing TI scope centers on three things: fixture counts justified against the adopted plumbing code chapter, gas piping sizing with total connected load and confirmed meter capacity, and grease waste handling for food service — interceptor sizing calculations plus the waste layout serving it. Show water heater sizing and recovery, and do not forget backflow prevention where the jurisdiction requires it.

Restaurants answer to the health department as well as the building department. Coordinate the plumbing scope with health plan review so the two agencies never receive conflicting drawings — that conflict is a special kind of delay that no checklist can fix after the fact.

Interior framing during a tenant build-out, where a tight drawing checklist keeps fast rollouts on schedule.
Interior framing during a tenant build-out, where a tight drawing checklist keeps fast rollouts on schedule.

The TI Permit Package Checklist

Run this on every site before anything is submitted. If an item does not apply, mark it N/A with a reason. Never leave it blank.

  • Architectural background drawings current and coordinated with MEP scope
  • Demolition plans showing all MEP removals and capping points
  • New HVAC plans with equipment tags matching the schedule
  • Mechanical equipment schedule with capacities, voltages, and MCA/MOCP
  • Outside air calculations with the adopted code section cited
  • Electrical load calculations per NEC Article 220
  • Panel schedules matching the load calculation and single-line diagram
  • Single-line diagram showing service, distribution, and grounding
  • Lighting plans, fixture schedule, and lighting power density calculations
  • Plumbing fixture count calculations with code citations
  • Gas piping isometric with total connected load and meter size
  • Grease interceptor sizing calculations for food service
  • Water heater sizing and recovery calculations
  • Fire alarm device layout and riser where required
  • Energy compliance forms for the adopted state code
  • AHJ submittal forms, fee calculations, and required copies or uploads

The Five Items Most Often Missing

Missing itemWhy examiners flag it
Energy compliance formsState-specific and easy to forget when the prototype came from another state
Load calc vs. panel schedule mismatchThe numbers must agree across every sheet, no exceptions
Plumbing fixture count backupA fixture count without a code citation is just an opinion
Grease interceptor sizingHealth and building departments both ask for it, independently
Deferred submittal listSprinkler and fire alarm scopes must be declared upfront, not discovered later

Handling Plan-Check Corrections

Never submit a partial response to a correction letter. Answer every comment by number, with a written response and a clouded revision on the drawings — even the ones you disagree with. Note the disagreement, cite the code section, and let the examiner rule. Silence reads as concession.

Corrections are normal. What kills schedules is treating each correction letter as a surprise. Log every correction by theme, respond completely, and resubmit the package the way that AHJ wants it — some want full sets, some want only revised sheets.

Then feed the pattern back into the prototype. If three jurisdictions in a row flag the same detail, the prototype is wrong, not the examiners. That feedback loop is the difference between a rollout that gets faster with every site and one that makes the same mistakes fifty times.

We run this checklist on every TI site before submittal — electrical, mechanical, and sprinkler scope coordinated into one permit package. Request a quote with your site plan and prototype.

Need similar drawings?

Get permit-ready multi-site rollout drawings for your project

Send us your plans and scope — we'll come back with a fixed price and a turnaround date. No obligation.

Get a fixed drafting quote in under 24 hours

Send us your architectural plans and scope. We'll come back with a fixed price and a turnaround date — no obligation.