How to Size Electrical Panels and Feeders Using NEC
Panel and feeder sizing is where a load calculation becomes hardware. This guide walks through NEC Article 215 — continuous loads at 125 percent,…

A panel schedule is a promise: every breaker on it will carry its load without nuisance-tripping, overheating a termination, or starving equipment of voltage. Feeder and panel sizing is where that promise gets engineered. Size too small and you inherit callbacks, failed inspections, and overheated lugs. Size too big and you have paid for copper and gear the building will never use.
NEC Article 215 governs feeders — the conductors between the service equipment and the final branch-circuit overcurrent devices — and by extension the panels they land in. The sizing sequence never changes: calculate the load, size the conductor, size the overcurrent protection, check voltage drop, then size the neutral and ground. Do it in that order and the numbers defend themselves in plan review. Skip a step and the reviewer will find the one you skipped.
1. Start from the load, not the catalog
Article 215.2(A)(1) states the feeder rule plainly: feeder conductors must have an ampacity not less than the noncontinuous load plus 125 percent of the continuous load. A continuous load is one where the maximum current continues for three hours or more — commercial lighting is the classic example. The 125 percent factor is not a comfort margin; it accounts for heat buildup at terminations and in enclosed raceways when current flows for hours at a time.
Apply it before anything else. A 90-amp continuous lighting load needs 112.5 amps of conductor before you even think about derating — not 90. This single step is where most undersized feeders are born: the designer sizes to the connected load, forgets the continuous multiplier, and the feeder runs hot for its entire life.
The feeder does not care what the panel is rated. Size the conductor to the calculated load, then pick hardware around it.
2. Worked example: sizing a 208Y/120V commercial feeder
Panel LP-1 serves a small retail tenant: 18 kVA of general lighting (continuous), 6 kVA of receptacles (noncontinuous), one rooftop unit with a 34-amp minimum circuit ampacity, and a 4.8-amp exhaust fan.
First convert everything to a common unit. The rooftop unit: 34 amps times 208 volts times 1.732, divided by 1000, equals 12.25 kVA. The exhaust fan: 4.8 times 208 times 1.732 divided by 1000 equals 1.73 kVA.
Now apply the feeder rule. Continuous load: 18 times 1.25 equals 22.5 kVA. Noncontinuous load: 6 plus 12.25 plus 1.73 equals 19.98 kVA. Total demand load equals 42.48 kVA.
Convert back to amps at the system voltage: 42,480 divided by (208 times 1.732) equals 117.9 amps. The feeder conductors must carry at least 118 amps — and that is the minimum before any temperature or bundling derating is applied.
3. Pick the conductor — then derate honestly
Table 310.16 gives 1/0 AWG copper THHN 150 amps in the 75-degree column. That looks generous against 118 amps, but the table value is a starting point, not an answer. Two adjustments apply.
First, the number of current-carrying conductors. This feeder runs in one raceway with three phase conductors plus a neutral. With LED lighting and other nonlinear loads, the neutral carries harmonic current and counts as current-carrying, so we have four conductors — an 80 percent adjustment factor. 150 times 0.80 equals 120 amps, still above 118. It passes, but barely, which is exactly the kind of margin a reviewer will probe.
Second, ambient temperature. At 30 degrees C the correction factor is 1.0 and we are done. But in a hot mechanical room at 40 degrees, the factor drops to 0.91: 150 times 0.91 times 0.80 equals 109 amps — now the 1/0 fails and the design moves up to 2/0. Always run both adjustments; the one you skip is the one that fails inspection.

4. Size the overcurrent protection
Section 215.3 mirrors the conductor rule: the feeder overcurrent device must be rated not less than the noncontinuous load plus 125 percent of the continuous load — 118 amps in our example. Standard breaker sizes in 240.6 run 100, 110, 125 amps and up, so 118 lands between standards.
Section 240.4(B), the next-size-up rule, permits the next higher standard rating when the conductor ampacity does not match a standard size, for circuits up to 800 amps. Our derated conductor carries 120 amps, so a 125-amp breaker is permitted and it satisfies the 118-amp minimum. The panel becomes a 125-amp, 208Y/120-volt, 3-phase, 4-wire panelboard with a 125-amp main breaker.
Note what the next-size-up rule does not do: it does not let you protect a 100-amp conductor with a 125-amp breaker. The breaker steps up from the conductor ampacity — it never leaps past what the conductor can carry.
5. Check voltage drop before you finalize
Voltage drop lives in an informational note rather than a hard code limit — 215.2(A)(4) suggests 3 percent on the feeder and 5 percent total from service to outlet — but plan reviewers and owners both treat chronic undervoltage as a defect. Motors run hot, LED drivers misbehave, and the fix after drywall costs ten times what upsizing copper costs now.
The three-phase formula: voltage drop equals 1.732 times K times I times L, divided by circular mils, with K equal to 12.9 for copper. Our feeder runs 140 feet one-way in 1/0 copper (105,600 circular mils) at 118 amps: 1.732 times 12.9 times 118 times 140, divided by 105,600, equals 3.5 volts. That is 1.68 percent of 208 volts — comfortably inside the 3 percent guideline. Had it landed at 4 percent, the answer would be the next conductor size up, not a debate about whether the note is enforceable.
6. Size the neutral and the equipment ground
Section 220.61 sizes the feeder neutral for the maximum unbalanced load between the neutral and any one phase. In our retail panel the lighting is the dominant 120-volt load, and with LED drivers generating harmonics the conservative and common answer is a full-size neutral — 1/0 AWG, the same as the phase conductors. On feeders with genuinely balanced three-phase loads and little neutral current, 220.61 permits a reduced neutral, but the calculation must be shown on the drawings. Never reduce it by habit.
The equipment grounding conductor comes from Table 250.122, keyed to the overcurrent device: a 125-amp breaker requires 6 AWG copper. For the raceway, four 1/0 conductors plus a 6 AWG ground fit in 1-1/2-inch EMT on paper, but the pull is miserable — a 2-inch raceway is the professional choice, and it leaves room for the future circuit the tenant will inevitably add.
Panel and feeder checklist
- Total the load at 100 percent noncontinuous plus 125 percent continuous
- Convert the demand load to amps at the system voltage
- Select a conductor from Table 310.16 and apply bundling and temperature derating
- Verify the final ampacity against the 75-degree column per 110.14(C)
- Size the breaker to 215.3 using the next-size-up rule in 240.4(B)
- Check feeder voltage drop against the 3 percent guideline
- Size the neutral per 220.61 and the ground per Table 250.122
Feeder sizing is arithmetic, but it is arithmetic the inspector redoes. Show every step — the load summary, the derating factors, the voltage-drop check — in the calculation set, and the review goes quiet. Our electrical load calculation service produces exactly that defensible package, and our electrical system design turns it into permit-ready panel schedules and one-line diagrams. Request a quote with your equipment list and floor plans.
Need similar drawings?
Get permit-ready electrical drawings for your project
Send us your plans and scope — we'll come back with a fixed price and a turnaround date. No obligation.
Keep reading
Related articles
ElectricalElectrical Room Layouts That Pass Plan Review
Electrical rooms collect more plan-review comments than almost any other space. Here is how we lay out clearances, dedicated space, and egress to NEC…
ElectricalEV Charging Permit Drawings: What AHJs Want to See
EVSE additions are one of the fastest-growing permit categories. This is the drawing package AHJs expect: 125-percent load calcs, panel schedules that…
Electrical7 Panel Schedule Mistakes That Trigger Plan-Review Corrections
Seven panel-schedule errors that reliably trigger correction letters — mismatched breakers, missing AIC ratings, load totals that do not tie — and how…